Unión Internacional de Telecomunicaciones   UIT
English  Français
 
Mapa Contáctenos Copia Imprimible
  Página principal : UIT-T : SG15 : Contribuciones  Nuevo -  Busque los documentos de la reunión
   
UIT-T SG15  C 

UIT-T SG15

Transport network structures

Periodo de estudios 2009

Resultados :78 documentos
Resultados :  1 - 2  - Siguiente Next
Contribuciones  [ Origen: AT ]   Documents / Contributions
 
Número 
Título Origen AI/Cuestión
Fecha
[ 2053 ]  
(Rev.1) 
Development of a new PTP Profile for Time/Phase Distribution     AT&T, Inc. , Sprint , SymmetriCom, Inc. , Verizon Communication Corporation   Q13/15   2012-08-24
[ 2045 ]  
 
Proposal to start work on OTN Performance Monitoring of Timing Adaptation processes     AT&T, Inc. , Ciena Corporation   Q9/15, Q14/15, Q13/15, Q11/15   2012-08-24
[ 2032 ]  
 
G.vdsl: Comments and proposed text for Data Gathering functionality at the VTU-O and VTU-R     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , AT&T, Inc.   Q4A/15   2012-08-24
[ 1723 ]  
(Rev.1) 
Request for evaluation of OTN support for CPRI     AT&T, Inc.   Q13/15   2011-11-21
[ 1722 ]  
(Rev.1) 
G.798 PT Interworking Smart?     AT&T, Inc.   Q9/15   2011-11-21
[ 1697 ]  
(Rev.1) 
G.vdsl: Proposed Event Types to Store in the Trace Buffer for Diagnosis of Retrains and Failed Inits     Adaptive Spectrum and Signal Alignment (ASSIA) Inc. , AT&T, Inc. , France Télécom Orange , Telecom Italia S.p.A.   Q4/15   2011-11-21
[ 1567 ]  
 
Principle of Cooperation and Lines of Responsibility     AT&T, Inc. , Cisco Systems, Inc. , Ericsson, Inc. , Juniper Networks , Nokia Siemens Networks GmbH & Co. KG , Verizon Communication Corporation   QALL/15   2011-11-18
[ 1329 ]  
 
Rationale for support of 1SL in Y.1731 and G.8021     AT&T , Verizon   Q9/15, Q10/15   2011-02-01
[ 1308 ]  
 
Reporting of results for pro-active measurement using SLM     Cisco , AT&T   Q9/15   2011-02-01
[ 1305 ]  
 
Procedural issues on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q11/15, Q10/15, Q1/15   2011-02-01
[ 1303 ]  
 
Inter SDO Cooperation on MPLS-TP     Cisco , AT&T , BT , Juniper , Qwest , Telenor , Telstra , Verizon   Q9/15, Q3/15, Q14/15, Q12/15, Q10/15, Q1/5   2011-02-01
[ 1300 ]  
 
Rationale to support Test ID in Delay Measurement in Y.1731 and G.8021     Verizon , AT&T   Q9/15, Q10/15   2011-02-01
[ 1290 ]  
 
Reporting of results for pro-active measurement using SLM     Cisco , AT&T   Q9/15   2011-02-01
[ 1249 ]  
 
PTN OAM upgrade from G.8114 to G-Ach+Y.1731 in China Mobile     CATR , China Mobile   Q10/15   2011-01-31
[ 1248 ]  
 
PTN GACh+Y.1731 OAM interoperability test activities and result     CATR , China Mobile   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-31
[ 1235 ]  
 
Proposal on maximum PTP clock number in the time reference model     CMCC , CATR , ZTE   Q13/15   2011-01-31
[ 1234 ]  
 
TOD specification     CMCC , CATR , Huawei , ZTE   Q13/15   2011-01-31
[ 1157 ]  
 
G.ploam: Proposed Text for Upstream Xlog Test Parameter     ASSIA , AT&T   Q4/15   2011-01-31
[ 1156 ]  
 
G.vector: Proposal for Upstream Xlog Test Parameter for G.vector     ASSIA , AT&T   Q4/15   2011-01-31
[ 1155 ]  
 
G.hnem: G.hnem management     ASSIA , AT&T , Aware , Maxim Integrated Product , Texas Instruments   Q4/15   2011-01-31
[ 1154 ]  
 
G.Gen, G.hx, G.cx: G.hn and G.cx management     ASSIA , AT&T , Aware , Marvell Semiconductor   Q4/15   2011-01-31
[ 1153 ]  
 
G.hn: Time-Varying Broadband Powerline (BPL) Interference into VDSL2     ASSIA , AT&T   Q4/15   2011-01-31
[ 1152 ]  
 
G.hn: Broadband Powerline (BPL) Interference into VDSL2 on Drop Lines: Measurements and Analyses     ASSIA , AT&T   Q4/15   2011-01-31
[ 1148 ]  
 
A proposal to start a new Recommendation for "Narrow band, sub 1 GHz, wireless transceivers - PHY & MAC layer specifications"     AT&T   Q4/15   2011-01-30
[ 1127 ]  
(Rev.1) 
Proposal to define IPv6 host config ME in G.988     Ericsson, AT&T, Alcatel-Lucent   Q2/15   2011-01-28
[ 1124 ]  
 
Structure and content of the MPLS-TP Recommendations     CMCC,CT , CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1123 ]  
 
Associated Channel Type for G.tpoam     CMCC, CT,CATR   Q9/15, Q14/15, Q12/15, Q10/15   2011-01-28
[ 1090 ]  
 
SD triggered protection switching in G.8031     CATR , Huawei   Q9/15   2010-05-21
[ 1070 ]  
 
1588v2 transmission by OSC over OTN     FiberHome , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1067 ]  
 
GPS timing receiver characterization     Symmetricom , CATR , CMCC   Q13/15, Q11/15   2010-05-21
[ 1066 ]  
 
Analysis of time synchronization performance using PTP in hybrid transport network     CMCC , CATR , ZTE   Q13/15, Q11/15   2010-05-21
[ 1065 ]  
 
Proposal of accelerating MTIE and TDEV mask study for time synchronization     CMCC , CATR , Huawei , ZTE   Q13/15   2010-05-21
[ 1064 ]  
 
Proposal of research on link asymmetry compensation for PTP     CMCC, ZTE, CATR   Q13/15   2010-05-21
[ 1062 ]  
 
Requirements for practical test setup and procedures specification for Measuring Arrangement to assess the degree of unbalance about earth     CATR   Q15/15   2010-05-21
[ 1061 ]  
 
Proposal of revising for SSM message delay description in G.8264     CATR   Q13/15   2010-05-21
[ 1060 ]  
 
Objectives and Requirements for G.827x Recommendations     CATR , Huawei   Q13/15   2010-05-21
[ 1059 ]  
 
Functionality proposals about MPLS-TP OAM toolsets in G.tpoam     CATR   Q10/15   2010-05-21
[ 1057 ]  
 
Some consideration with 40G intra-office interface parameters     CATR   Q6/15   2010-05-21
[ 1056 ]  
 
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     CATR , Huawei   Q6/15   2010-05-21
[ 1055 ]  
 
40G application code for G.698.2     CATR   Q6/15   2010-05-21
[ 1048 ]  
 
Proposal to include PDM-BPSK into 40G modulation formats in G.sup39     CATR   Q6/15   2010-05-22
[ 1041 ]  
 
Issues about metrics of network limits for time synchronization     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1040 ]  
 
Field test of 1588v2 time sync based on physical layer frequency sync support     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1037 ]  
 
1588v2 test results with different clock mode and field network     ZTE , CATR , CMCC   Q13/15   2010-05-20
[ 1025 ]  
 
Clarification on ODU Multiplexing     AT&T   Q13/15, Q12/15   2010-05-20
[ 904 ]  
 
G.827x Recommendations - High-Level Objectives     Huawei , CATR , MII   Q13/15   2010-05-18
[ 903 ]  
 
Pulse-Per-Second Interface     Huawei , CATR , China Mobile Communications Corporation , MII   Q13/15   2010-05-18
[ 823 ]  
 
Propose to add an appendix to describe EVPRM solution to G.8011.4     Alcatel Lucent Shanghai Bell , CATR , Ministry of Information Industry of P.R. of China   Q10/15   2010-05-17
[ 807 ]  
 
G.hn Management and Diagnostics Specifications     AT&T   Q4/15   2010-05-16
[ 806 ]  
 
Proposed ITU-T Rec. on remote management of CPE     AT&T , ASSIA Inc , Qwest , Verizon   Q4/15, Q2/15, Q1/15   2010-05-16
Resultados :78 documentos
Resultados :  1 - 2  - Siguiente Next
 
Telecarga de múltiples documentos: Marcar las casillas correspondientes a los documentos seleccionados, a continuación pulsar "Telecargar"
   
 
Preferencias del usuario: 
Telecarga de múltiples documentos: Formatos e idiomas que hay que tener en cuenta (si están disponibles):
Páginas de navegación HTML  
Formatos  + Otros formatos
Idiomas (máximo 2)  + Multilingüe  
(E: inglés - F: francés - S: español - A: árabe - C: chino - R: ruso)

Pruebe ITU Translate, la herramienta de traducción automática de documentos
Comienzo de la página -  Comentarios -  Contáctenos -  Copyright © UIT 2008 Reservados todos los derechos
Contacto público :  TSB EDH
Actualizado el : 2024-5-15